Page 130 - LIT-18626-12-95
P. 130
Equipment operation
NOTICE To collapse the wakeboard tower:
(1) 252XE: Fold the mirror. (See page 112 for
Do not modify the wakeboard tower to tow information on folding the mirror.)
from it or to carry accessories not de- (2) While an assistant supports the wake-
signed for it. The wakeboard tower could board tower, completely loosen the lock
be damaged. Also, the wakeboard tower knobs on both sides of the wakeboard
collapsing feature is intended for storage tower.
only. The boat should not be transported
or operated with the tower in the col-
1
lapsed position. 2
Collapsing and setting up the
wakeboard tower
(AR250 / 252S / 252XE)
When storing the boat, collapse the wake-
board tower.
NOTICE
1 Wakeboard tower
z Accidentally dropping the wakeboard 2 Lock knob
tower while collapsing or raising it can
damage the tower, the boat, or both. An (3) Lower the wakeboard tower until it
assistant needs to help hold the wake- stops.
board tower in place during the proce-
dure.
z Do not operate the boat or transport it
on the trailer with the tower in the col-
lapsed position to avoid possible dam-
age.
To set up the wakeboard tower:
(1) Lift the wakeboard tower.
(2) While an assistant supports the wake-
board tower, tighten the lock knobs on
both sides of the wakeboard tower until
they stop.
122