Page 112 - LIT-18626-14-04
P. 112
SportsBoat_F4V14.book Page 104 Tuesday, July 5, 2022 2:34 PM
Pre-operation checks
WARNING
Failure to inspect or maintain the boat properly increases the possibility of an accident
or damage to the boat. Do not operate the boat if you find any problem.
If a problem cannot be corrected by the procedures provided in this manual, have the
boat inspected by a Yamaha Boat Dealer.
Pre-operation checklist
Before operating this boat, perform the checks in the following checklist. Always follow the in-
spection and maintenance procedures and schedules described in this owner’s/operator’s man-
ual.
Pre-operation checks should be made each time the boat is used. These checks can be com-
pleted in a short time. It is worth the time spent to ensure safety and reliability.
ITEM CHECK PAGE
PRE-LAUNCH CHECKS
Steering system Check for proper steering operation. 105
Remote control lever Check for proper throttle operation. 105
Check for proper shift operation.
Fire extinguisher Check readiness of the extinguisher. 106
Hull Check hull for damage and cracks before launching. —
Access port cap Check for proper installation. 107
Jet intake Check that no debris is in the intake before launching. 108
Fuel system Check fuel system for leaks. 108
Engine oil level Check engine oil level; add as necessary. 98, 108
Battery Check battery condition, mounting, and connection. 109
Bilge water Check the engine compartment for bilge water. 110
Drain plugs Check the drain plugs for damage and foreign material 110
and check that they are securely installed.
Engine compartment and Open the engine hood and check to be sure no gasoline, 110
blower gasoline vapors, or loose electrical connections are
present. Operate the blowers for at least 4 minutes.
Engine hood Check that the hood latch is secure. 78
Lights and horn Check lights to be sure they operate. Push the horn 111, 111
switch to be sure it operates.
Bimini top Check that the top is secure. 90, 93
Engine shut-off cord (lan- Check the engine shut-off cord (lanyard) for damage. 112
yard)
Collapsible tower fasten- Check that the tower fasteners are secured. 89
ers (195S / AR195 / AR190)
POST-LAUNCH CHECKS
Switches Check operation of the main switch and engine shut-off 112
switch.
Cooling water pilot outlet Check that water comes out while the engine is running. 112
Fuel level Check fuel level; add as necessary. 113
The steering and shifting pre-operation checks will require two persons: one person to oper-
ate the controls and one person to observe the proper operation at the stern.
104