Page 147 - LIT-18626-12-95
P. 147
Operation and handling requirements
Draining the bilge water on water
This model is equipped with a self-draining
deck and bilge pump to drain the bilge water
on water.
Self-draining deck
Most water that enters the deck area drains
automatically out the stern through the large
drain hole in the deck. 1
A one-way check valve in the drain prevents
water from traveling back to the deck while
1 Bilge pump outlet
the boat is moored or moving in reverse.
TIP:
Bilge pump z 252S / 252SE / 252SD: The “BILGE” switch
Your boat is equipped with a drainage sys-
light comes on while the bilge pump is op-
tem that channels water that enters the boat
erating.
from the storage compartments to the bilge
252S
under the engine compartment.
When the “Bilge” button is tapped, the bilge
pump will operate.
1
NW N NE
FUEL DEPTH
50 % FLOAT MODE 0 Ft
°F
Water Temp
START HOUSE
36.3 V 11.8 V
Bilge Blower Nav Anchor 1 “BILGE” switch
1 252SE / 252SD
1 “Bilge” button
1
1 “BILGE” switch
139