Page 159 - LIT-18626-14-02
P. 159
SportsBoat_F4Y12.book Page 151 Tuesday, July 5, 2022 1:54 PM
Pre-operation checks
252S Engine shut-off cord (lanyard) check
Make sure that the engine shut-off cord (lan-
yard) is not damaged. If the cord is damaged,
1 replace it. WARNING! Never try to repair
the engine shut-off cord (lanyard) or tie it
together. The engine shut-off cord (lan-
yard) may not pull free when the operator
falls off, allowing the boat to continue to
run and cause an accident.
1 “HORN” switch
252SE / 252SD
1
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the boat is in the
water and the engines are running.
1 “HORN” switch
252XE Engine shut-off switch check
Check the engine shut-off switch for proper
operation.
(1) Start the engines. (See page 154 for in-
formation on starting the engines.)
(2) Pull the engine shut-off cord (lanyard) to
remove the clip from the engine shut-off
switch to make sure that the engines
HORN
BILGE
stop immediately.
(3) Make sure that the engines cannot be
1
started with the clip removed from the
1 “HORN” switch engine shut-off switch.
151

