Page 160 - LIT-18626-12-95
P. 160
Pre-operation checks
252S
1
1 “HORN” switch
Post-launch checks
Perform the post-launch checks in the pre-
252SE / 252SD
operation checklist while the boat is in the
water and the engines are running.
1
Engine shut-off switch check
Check the engine shut-off switch for proper
operation.
(1) Start the engines. (See page 154 for in-
formation on starting the engines.)
(2) Pull the engine shut-off cord (lanyard) to
remove the clip from the engine shut-off
switch to make sure that the engines
1 “HORN” switch
stop immediately.
Engine shut-off cord (lanyard) check (3) Make sure that the engines cannot be
Make sure that the engine shut-off cord (lan- started with the clip removed from the
yard) is not damaged. If the cord is damaged, engine shut-off switch.
replace it. WARNING! Never try to repair AR250 / SX250 / 252S
the engine shut-off cord (lanyard) or tie it
together. The engine shut-off cord (lan-
yard) may not pull free when the operator
falls off, allowing the boat to continue to 1
run and cause an accident.
2
1 Engine shut-off switch
2 Clip
152