Page 158 - LIT-18626-12-95
P. 158
Pre-operation checks
252SE / 252SD AR250
2
1
1
1 “BLOWER” switch 1 Bow light
2 Anchor light
Navigation and anchor lights checks
Make sure that the bow light and anchor light SX250
operate properly.
The procedure for setting up the anchor light 2
varies according to the model. See the page
indicated below for your boat. 1
SX250: See page 114.
TIP:
SX250: Before operating the boat in daylight
hours after checking the navigation and an-
chor lights, store the anchor light.
252S / 252SE / 252XE / 252SD
1 Bow light
2 2 Anchor light
1 To check the operation using the multi-func-
tion display:
(1) Tap the “Navigation” light button on the
system control screen. Check that the
bow light and anchor light come on when
the button is blue and that both lights go
off when the button is gray.
(2) Tap the “Anchor” light button on the sys-
1 Bow light
tem control screen. Check that only the
2 Anchor light
anchor light comes on when the button is
blue and that the anchor light goes off
when the button is gray.
150