Page 165 - LIT-18626-15-29
P. 165
SportsBoat_F5K15.book Page 154 Wednesday, May 22, 2024 1:58 PM
Pre-operation checks
AR250 / SX250 Engine shut-off cords (lanyards)
check
Make sure that the engine shut-off cords (lan-
1
yards) are not damaged. If the cord is dam-
aged, replace it. WARNING! Never try to
HORN
BILGE
repair the engine shut-off cord (lanyard) or
tie it together. The engine shut-off cord
(lanyard) may not pull free when the oper-
ator falls off, allowing the boat to continue
to run and cause an accident.
1 “HORN” switch
252S
1
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the boat is in the
1 “HORN” switch
water and the engines are running.
252SE / 252SD
1
1 “HORN” switch
154

