Page 101 - LIT-18626-14-70
P. 101

SportsBoat_F6A11.book  Page 94  Thursday, June 15, 2023  8:14 AM



                                                                Pre-operation checks


                                 ITEM                          CHECK                     PAGE
                         POST-LAUNCH CHECKS
                         Switches              Check operation of the main switches and engine shut-  102
                                               off switch.
                         Cooling water pilot outlets  Check that water comes out while the engines are run-  103
                                               ning.
                         Fuel level            Check fuel level; add as necessary.        103
                        The steering and shifting pre-operation checks will require two persons: one person to oper-
                        ate the controls and one person to observe the proper operation at the stern.



















































                                                                                               94
   96   97   98   99   100   101   102   103   104   105   106