Page 97 - LIT-18626-13-01
P. 97
SportsBoat_F6H10.book Page 90 Tuesday, January 19, 2021 5:51 PM
Pre-operation checks
ITEM CHECK PAGE
POST-LAUNCH CHECKS
Switches Check operation of the main switches and engine shut- 97
off switch.
Cooling water pilot outlets Check that water comes out while the engines are run- 98
ning.
Fuel level Check fuel level; add as necessary. 99
The steering and shifting pre-operation checks will require two persons: one person to oper-
ate the controls and one person to observe the proper operation at the stern.
90

